A Colorbond steel fence is the usual choice for side and rear boundaries on the newer Clyde estates. Published national averages put a supplied and installed Colorbond fence at $85 to $100 per metre, before gates, old fence removal and site extras. A common height for residential runs is 1.8 metres, which sits inside the permit exemption for side and rear fences up to 2 metres under the Building Regulations 2018.

Why do so many Clyde lots end up with steel fences?
Clyde has grown fast. The 2021 census counted 11,177 people in the suburb, and 97.5 per cent of occupied dwellings were separate houses, with 68 per cent of homes owned with a mortgage (ABS QuickStats, Clyde). That is a picture of new house and land packages, where the fences go up after handover and the owners on each side are often moving in within weeks of each other.
Steel sheet suits that situation. BlueScope, which makes the steel, says on its Colorbond fencing page that the fence will not rot or be eaten by termites and does not need painting or oiling. The infill sheets, posts and rails come in the same colour on both sides, which avoids an argument about who gets the good side.
Steel or timber for your boundary
| Point to compare | Colorbond steel | Treated pine paling |
|---|---|---|
| Published installed range | $85 to $100 per metre | $75 to $120 per metre |
| Upkeep | Hose down; no painting needed | Stain or paint to protect the timber |
| Look on each side | Same colour both sides | Rails and posts show on one side |
| Termites and rot | Not affected | Posts in the ground can decay over time |
| Repair after damage | Replace sheets or rails to match colour | Replace palings or a bay |
If you want timber instead, the timber paling fence guide covers paling choices, and the Clyde fencing cost guide sets every published range side by side.
What a provider will check before quoting
A fencing contractor needs more than the length of the boundary. Expect questions about:
- The boundary line. Pegs from your land surveyor or the title plan show where the fence goes. A new fence on the wrong line is expensive to move.
- Fall across the block. Hipages notes that installers may have to cut panels and rails on a sloping block, which adds labour. Clyde blocks are mostly flat, but cut and fill between neighbouring lots can leave a step at the boundary.
- Soil. Soft soil needs larger holes and more concrete, and rocky ground takes longer to dig, according to the same hipages Colorbond cost guide.
- Underground services. Post holes along a side boundary can sit near stormwater, sewer, gas or communications lines. A careful provider will ask for plans from Before You Dig Australia before digging.
- Easements. Many estate lots have a drainage easement along the rear boundary. The City of Casey’s building over easements guideline puts a solid boundary fence in its consent category, with footings outside the offset from the drain, so ask the provider how the posts will be placed if your rear fence crosses one.
- The neighbour’s agreement. On a shared boundary the cost and the design are normally agreed between owners first. The dividing fence guide explains the notice process.
How a steel fence goes in
The usual sequence is to string the line, dig post holes at the panel spacing, set the posts in concrete and then slide the infill sheets between top and bottom rails. Hipages lists standard panel widths of about 2.38 metres, with wider 3.15 metre panels also made, and standard heights from 0.9 to 2.1 metres.
One detail separates a careful installer from a rushed one. BlueScope says the posts carry a different metallic coating that makes them suitable for setting in concrete, but concrete should not touch the rails or the infill sheets because it can affect the steel. It also tells buyers to get footing design and installation guides from the fence supplier. Ask your provider whether the bottom rail will sit clear of the concrete and clear of garden soil.
Rules that apply in Victoria
Building permits. Schedule 3 of the Building Regulations 2018 exempts most fences from a building permit if they are no higher than 2 metres. Lower limits apply near a street: 1.5 metres within 3 metres of the street alignment for a fence that is not masonry, and 1 metre above the footpath within 9 metres of the corner where two streets meet. Corner lots in Clyde estates often hit that last rule where the side fence turns toward the front. A fence that forms part of a pool safety barrier is outside the exemption altogether.
Registration and contracts. The Building and Plumbing Commission (BPC) says on its landscaping page that fencing is generally domestic building work. Once a contract goes over the price threshold on that page, the work needs a registered building practitioner and a major domestic building contract. The BPC lists a registration class called Domestic Builder (Limited to the construction of gates and fences).
Insurance. For contracts signed from 1 July 2026, the BPC’s Home Warranty scheme covers eligible domestic building work above the value it sets. A long boundary plus gates can reach that value, so ask the provider whether it applies.
What a careful provider will not do
- Start on a shared boundary before you confirm the neighbour has agreed or the notice period has run.
- Pour concrete up around the rails or bury the bottom sheet in soil.
- Use touch-up paint freely on scratches. BlueScope says air-dried touch-up paint weathers differently from the factory finish and can leave patchy fading.
- Paint the fence a different colour on one side without telling you that BlueScope says painting voids the warranty on the sheets, posts and rails.
- Build a front return over 1.5 metres within 3 metres of the street without checking whether a permit is needed.
Upkeep once it is up
BlueScope says rain keeps most exposed steel clean, and areas that rain does not reach should be hosed every six months, more often near the coast. Keep garden beds and mulch below the bottom rail. Owners in Tooradin on Western Port have more reason to rinse salt off than owners in Clyde.
Next step
Measure the run, note where gates go and check the neighbour is on board. Then send your Colorbond fencing details through the quote form and an independent local fencer can decide whether to quote. Clyde Fencing passes enquiries on and does not install fences itself; the about page explains how that works. Owners in Clyde and Clyde North can also read their suburb pages for local points.
Frequently asked questions
- What height is a normal Colorbond boundary fence in Clyde?
1.8 metres is a common height for suburban side and rear runs. Panels are made in standard heights from 0.9 to 2.1 metres, but a fence over 2 metres falls outside the building permit exemption in the Victorian regulations and also needs your neighbour's agreement on cost.
- Can each side of a Colorbond fence be a different colour?
Generally no. BlueScope says the sheets, posts and rails are the same colour on both sides and that different coloured sheets cannot be fitted back to back. Painting one side is possible, but BlueScope says that voids the warranty on the painted parts, so agree the colour with your neighbour before ordering.
- Does a Colorbond fence need a building permit?
A side or rear fence up to 2 metres is usually exempt. Limits drop near the street, to 1.5 metres within 3 metres of the street alignment and 1 metre above the footpath within 9 metres of a street corner. Anything forming part of a pool barrier needs a building surveyor's advice.
- How long does a Colorbond fence take to install?
Hipages says a small fence may be finished in a day while a long boundary can take weeks, depending on slope, panel cutting and whether an old fence comes out first. Concrete around the posts also needs time to set before the sheets are loaded, so the provider will give you a time frame when quoting.
- Will a Colorbond fence rust near the coast?
BlueScope advises hosing parts of its coated steel that rain does not wash every six months and more often in coastal areas. Ask the fence supplier which product and warranty terms suit a site close to Western Port, and keep soil and mulch off the bottom rail.